10 months ongoing issue with the glycol dehydration system causing reduced uptime and production losses. Traditional Root Cause analysis by the company’s engineers had failed to provide a solution.
Solution
BDC’s Causal Algorithms identified measured “Cause-Effect” relationships (some known, some not). One unknown causal driver was the root cause behind the production loss. This meant future problems could be predicted and a successful solution was provided.
Successful Outcome
Our Causal Algorithms led to a recovery uptime increase of 5% equating to a $10.5 mill USD per month
Quote from the Chief Engineer of the FPSO “Overall, I can see a great benefit in applying the CLA algorithms across much of the oil & gas industry”